Metallurgy Production Control template
Track melting, casting, heat treatment and inspection lots with order revisions, equipment records, heat identity and documented release decisions. Fictional example with 60 linked records, 20 saved views, three dashboards and nine native workflows.
Tables
Production lots
Production lot, Reference, Status, Grade family, Priority, Casting order, Process asset, Production area, Heat identity, Charge lot reference, Casting identity range, Drawing revision, Heat-treatment load, Treatment record reference and 23 more
Casting orders
Casting order, Reference, Status, Production area, Drawing reference, Drawing revision, Example material specification, Inspection plan reference, Requested inspection documents, Order allocation (€), Start date, Due date, Process asset, Production lots and 4 more
Process assets
Process asset, Asset identity, Calibration record, Qualification record, Equipment type, Status, Available schedule hours, Booked schedule hours, Unbooked schedule hours, Equipment record review due, Production lots, Assigned work items, Notes
Quality checks
Quality check, Status, Production lot, Casting order, Review category, Sample identity, Example method revision, Evidence record reference, Heat identity, Process asset, Grade family, Priority, Due date, Missing evidence items and 5 more
Follow-up actions
Action, Status, Production lot, Casting order, Quality check, Disposition reference, Process asset, Priority, Due date, Effort (hours), Completed, Days overdue, Notes
Views
- All records (grid)
- Status board (kanban)
- Schedule (calendar)
- All records (grid)
- Status board (kanban)
- Schedule (calendar)
- All records (grid)
- Status board (kanban)
- Schedule (calendar)
- All records (grid)
- Status board (kanban)
- Schedule (calendar)
- …and 8 more
Forms
- Register a production lot
- Record an inspection review
- Suggest a follow-up
Automations
- Inspection evidence gap creates a linked follow-up
- New production lot intake notification
- Approved release updates the lot stage
- Completion closes the follow-up
- Equipment schedule overload notification
- Daily overdue follow-up digest
- “Quality checks” reached “Accepted”
- Daily sweep — still open in “Production lots”
- Large value in “Example piece mass (kg)”
It is a starting point, not a fixed product
Installing the template creates these tables in your own workspace. Rename a column, add a field, change a view or delete a table you do not need — it is an ordinary Appdor app from the first minute, and your existing spreadsheet can be imported into it.