Construction Project Tracker template
Projects, phases, subcontractors, and RFIs — a phase timeline with dependencies, planned-vs-actual slip formulas, budget rollups from phase costs, an overdue-RFI flag with a daily check, and DUNS-validated subcontractors.
Tables
Projects
Project, Status, Project manager, Start, Target end, Project code, Client, Contract type, Building permit, Site address, Plot area (m²), Built area (m²), Floors, Budget and 12 more
Phases
Phase, Project, Status, Subcontractor, Planned start, Planned end, Actual start, Actual end, Cost, Project record, Project manager, Trade, Site foreman, Crew size and 11 more
Subcontractors
Company, Trade, DUNS number, Email, Phone, Rating
RFIs
RFI #, Project, Subject, Status, Submitted, Response due, Assigned to, Overdue
Views
- Phase timeline (timeline)
- RFI board (kanban)
- Phases by project (grid)
- Portfolio (grid)
Forms
- Submit an RFI
Automations
- Daily overdue-RFI check
- Email the design team on new RFI
- New record in “Phases”
- “Phases” reached “Done”
- “RFIs” reached “Closed”
- Daily sweep — still open in “Phases”
- “Certified for payment” was ticked in “Phases”
- Large value in “Cost”
It is a starting point, not a fixed product
Installing the template creates these tables in your own workspace. Rename a column, add a field, change a view or delete a table you do not need — it is an ordinary Appdor app from the first minute, and your existing spreadsheet can be imported into it.